Go Green Road Repair Tape is a quick pavement repairing material for solving pavement cracks and repair pockmarked road.
The main material is high polymer modified asphalt, and the particles are fired from basalt with a certain gradation. The asphalt repair tape is a three-layer structure: easy to remove protective isolation film + high polymer modified asphalt + graded crushed stone. The asphalt repair tape subsidy has a simple construction process, does not require heating, environmentally friendly construction, no dust, smoke and other harmful substances are discharged during construction, and can be rolled, pasted, spliced or cut according to the road conditions, no material waste, to achieve green energy saving and environmental protection construction.
The construction process of Go Green road repair tape is very simple, no heating, eco-friendly construction, no dust, smoke and other harmful substances are discharged. Outstanding features are below:
1. Fast construction: Go Green road repair tape is a wide temperature range and high adhesion type, and the construction can be completed in three steps: cleaning - peeling off the film and pasting - rolling.
2. Sealing and waterproofing: Go Green road repair tape can effectively seal the cracks in the pavement to avoid further damage to the pavement caused by the infiltration of rainwater into the cracks.
3. Low noise and anti-skid: After repairing , the colloid is embedded in the crack of the road surface after being rolled by the vehicle, which can effectively reduce the driving noise, and the vehicle will not slip when driving on it.
4. Quickly open to traffic: Go Green road repair tape can quickly repair pavement mesh cracks, and open to traffic immediately after construction, no heating, no maintenance, and no waiting.
5.Cost saving: Go Green road repair tape construction works with only two people, no large equipment is required, and construction costs are greatly saved.
6. High temperature, no flow and low temperature crack resistance: The high polymer modified asphalt used in Go Green road repair tape has added a variety of additives to improve the softening point and penetration, and has better high and low temperature performance.
Go Green Road Repair Tape Construction Method
Go Green asphalt repair tape is self-adhesive, no need to heat, no construction equipment, just 3 simple steps to repair pavement cracks and mesh cracks.
1) Road cleaning: Use a portable hair dryer or broom to remove any floating dust, dirt, etc. in the cracked area
2) Crack filling (if necessary): For individual wide seams or tiny pits, you can use Go Green asphalt repair tape to twist it into strips or lumps to fill and then paste the net cracks.
3) Peel off the film and paste: Put a roll of Go Green asphalt repair tape on one end of the mesh crack area, peel off a section of protective film, and stick the mesh with the self-adhesive glue on the road, then one person pulls the film, and the other person rubs the roll of asphalt repair tape. The grid cracking sticker rolls along the cracking area until the grid cracking sticker completely covers the cracking area. During the pasting process, the grid cracking sticker should exceed 10cm on both sides of the cracking area.
4) After the paste is completed, use an iron roller or a small road roller to roll 1-2 times to ensure compaction.
5) Open to traffic. After the traffic is opened, the repair effect will be better.