Warm mixed colored asphalt, like cold mixed colored asphalt, belongs to the thin layer technology, but the mixing temperature of warm mixed asphalt is 100-120 ℃, and the finished product has a short open traffic time, which can be passed in 2-3 hours.
Compared with the paving thickness of at least 3cm for conventional hot mix colored asphalt, Go Green asphalt can effectively reduce the cost of the project.
Our company can provide warm mixed colored asphalt raw materials, which can be locally produced by customers. Please feel free to call us for inquiries.